Research is Som’s job. This Gantt is almost entirely Som steps. Keli routes Cosmic questions and reviews what Mark can say. Mark and Jonathan are not on the research checklist — they only unblock product or beachhead decisions when asked. Notes: verticals plan · viability.
How work moves: Som researches from primary public sources · labels every claim · prepares Tuesday packs and Mark one-pagers · sends Cosmic-gated questions to Keli when needed · folds answers the same day they return. WIP: one deep vertical (data centers) until Mark-ready.
Show
Status
Today is Tue 3 Nov (teal line)
Tue 3 Nov
Mon 9 Nov
Mon 16 Nov
Mon 23 Nov
Mon 30 Nov
Mon 7 Dec
Mon 14 Dec
Foundation — Som ownsKeli only routes §A; she does not research
F0 Ship and maintain the research Gantt + plan docs
Keep the live Gantt and plan docs matching real work so everyone sees one timeline.
We can do it nowTue 3 Nov ongoing
Som
F1 Draft Cosmic-gated §A one-pager (for Keli to route)
Write Cosmic-only product questions as one page Keli can route to Jared / Jonathan.
We can do it nowTue 3 Nov to Wed 4 Nov
Som
F2 Keep open-questions + audit log current
Track what is answered, still blocked, or stale so Tuesday packs stay honest.
We can do it nowTue 3 Nov to Tue 15 Dec
Som
Data centers (deep) — SomWIP=1. Beachhead assumption: operators / colo
D1 DCIM / BMS / ticket incumbent map
Name DCIM / BMS / ticket tools Cosmic should enhance — not replace — for operators.
We can do it nowTue 3 Nov to Fri 6 Nov
Som
D2 Operator / colo genAI public claims
Log what colo and operators already claim for genAI so we do not pitch into a vacuum.
We can do it nowTue 3 Nov to Mon 9 Nov
Som
D3 Construction genAI + Pulse-on-DC check
Pull construction AI primary sources and re-check whether Pulse shows on named DC jobs.
We can do it nowWed 4 Nov to Tue 10 Nov
Som
D4 Data-center brief Mark-ready freeze
Freeze the data-center brief Mark can use, with a can-say / cannot-say list.
We can do it nowMon 9 Nov to Tue 10 Nov
Som
Token & cost model — SomScenarios only until Cosmic COGS arrives
E1 Scenario model stub (labeled bands)
Build labeled cost scenarios so nobody quotes fiction as Cosmic performance.
We can do it nowWed 4 Nov to Fri 6 Nov
Som
E2 Weekly list-rate refresh before pack freezes
Refresh OpenAI / Anthropic / Google list rates before each pack freeze.
We can do it nowTue 3 Nov to Tue 15 Dec
Som
Thin verticals — SomAfter DC freeze only
V1 Utilities thin brief
Thin utilities brief (public cases + high-level CIP notes) after DC is Mark-ready.
Waiting on DC freeze (D4)Mon 16 Nov to Fri 20 Nov
Som
V2 Manufacturing thin brief
Thin manufacturing brief (OT/IT + enhance targets) after the utilities skeleton.
Waiting on utilities skeletonMon 23 Nov to Fri 27 Nov